MOQ and pricing

Shapewear MOQ and Quote Planning

A useful MOQ is tied to a defined style, colour, material, size curve and packing route. A single headline number without those assumptions cannot produce a stable quotation.

High-waist tummy-control bodysuit reference for quote planning
01300 pcsBase MOQ per style / colour
02StylePattern and construction
03ColourFabric and trim plan
04SizeCutting and packing curve

01 / Decision file

Separate specification from commercial terms.

Two prices are only comparable when the garment and the responsibilities are the same.

01

Material and construction

Fabric weight, modulus, lining, mesh, boning, closures, edge finish and panel count.

02

Order structure

Quantity by style, colour and size; sample charges; testing; label and packing requirements.

03

Commercial terms

Incoterm, freight responsibility, payment route, currency and validity period.

02 / How to plan the first batch

Protect the range without hiding the true order structure.

The first order should generate enough size and colour coverage to test the market while keeping the development and packing scope controlled.

01

Start with one anchor style

Approve construction and fit before adding colourways or derivative silhouettes.

02

Build a realistic size curve

Use the buyer’s sales plan and target market rather than an even split by default.

03

Separate launch and repeat

Keep the first-order assumptions visible so reorders can be compared on the same basis.

03 / Quote hygiene

Ask for assumptions in writing.

The quotation should make exclusions and dependencies easy to see.

01

Unit basis

State currency, quantity break, size range and colour assumption.

02

Included work

List sample, label, packing, inspection and test costs that are included.

03

Exclusions

Name buyer-supplied materials, third-party testing, freight or duties that are not included.

Questions / short answers

What buyers ask before a sample.

Why is MOQ expressed per style and colour?

Fabric, cutting, trim and packing minimums often apply at that level. The exact quantity depends on the materials and route.

Can a sample cost be deducted from bulk?

Any deduction should be stated in the quotation or agreement. Do not assume it applies.

Does a higher quantity always reduce the unit price?

Not automatically. Material, construction, packing and inspection costs still determine the final quote.

Project review

Need a quote on a defined brief?

Share the style, material direction, quantity plan and market so the quotation assumptions can be made explicit.

Review My Project