OEM development
Bring a tech pack, pattern, measurement set or approved sample. The factory reviews construction, materials, grading and production feasibility.
Manufacturing services
OEM, ODM and private label are different starting points, not interchangeable labels. The route determines what the buyer supplies, what the factory develops, how ownership is recorded and which approvals are needed before bulk.
01 / Decision file
A route is suitable when the buyer can supply the required inputs and approve the resulting standard before production.
Bring a tech pack, pattern, measurement set or approved sample. The factory reviews construction, materials, grading and production feasibility.
Start from a reference construction and adapt silhouette, control zones, fabric, trims, branding and packaging to the target range.
Use an approved style and apply the buyer’s labels, care marks, barcodes and packaging route under written approval.
02 / Inputs and ownership
The commercial route should state which files are buyer-owned, which development assets are supplied by the factory and how changes are approved.
Tech pack, fit standard, artwork, labels, packaging files, target market and compliance requirements.
Pattern version, BOM, measurement sheet, sample comments and approved production sample.
Any change to fabric, trim, construction, measurement or label should trigger a documented review before reorder.
03 / Quote readiness
A comparable quotation needs identical garment construction, size curve, colour plan, packaging and trade terms.
Silhouette, panels, closure, lining, edge finish and size range.
Quantity by style, colour and size, sample requirement, labelling and packing.
Delivery window, Incoterm, payment route and responsibility for testing or third-party inspection.
Questions / short answers
ODM usually starts from a closer reference, but fit review and sample approval remain necessary. OEM can be efficient when a complete tech pack and approved sample are already available.
Yes, when the selected construction is available for the intended programme and the label, packaging and order conditions are approved in writing.
Only the items stated in the quotation. Compare materials, samples, testing, packing, freight terms and payment conditions line by line.
Next / related files
Project review
Send the reference, market, size range and quantity. The first review will identify the missing inputs before a sample is quoted.