Construction feasibility
Check panel layout, seam or bond route, edge finish, closure and lining against the intended silhouette.
OEM development
The OEM route starts with the buyer’s construction intent. Send the tech pack, pattern, measurement set or approved sample so the factory can review feasibility before quoting the development and production scope.
01 / Decision file
The first review separates a clear specification from an assumption that could become an expensive change later.
Check panel layout, seam or bond route, edge finish, closure and lining against the intended silhouette.
Confirm fabric, modulus, stretch direction, colour and trim references before sampling.
Review POM, tolerances, size anchors and grade rules for the target body range.
02 / Sample sequence
The sample route should answer construction questions before the size set and production sample are approved.
Prove the pattern, construction and major materials on the reference size.
Review graded measurements, stretch recovery, comfort and movement across the size curve.
Freeze the fabric, trims, measurements, labels and packing that bulk must match.
03 / Change control
A written difference list protects both the buyer and the factory when a material, trim, measurement or process changes.
Record tech pack version, artwork approval, pattern ownership and any buyer-supplied components.
Keep BOM, sample comments, approved swatches, measurement sheets and issue logs under one style reference.
Confirm the approved standard, quantity, packing and inspection plan before cutting begins.
Questions / short answers
A first concept can be reviewed, but OEM pricing and sampling need a defined garment. The team can help convert the concept into a measurable brief before the route is confirmed.
Ownership should be agreed in the project terms. The factory should not reuse buyer-owned files outside the approved programme.
No. Prototypes and fit samples are development tools. The pre-production sample is the approved reference for bulk.
Next / related files
Project review
Send the files, reference sample and target order scope for a construction and sampling review.