RFQ and quotation planning

Shapewear RFQ Checklist for Comparable Factory Quotations

A comparable RFQ gives every supplier the same garment, quantity and responsibility. Use the fields below to prepare a written brief and mark unknown items clearly.

High-waist shapewear reference for RFQ planning
Same brief before price Garment · Quantity · Approval · Commercial scope
1 briefShared specification version
300 pcsBase MOQ per style / colour
5 sectionsDecisions to define before quoting
6 filesBlank working worksheets

01 / Build the brief

Make the supplier price a defined product, not an assumption.

The goal is not to complete every answer before the first email. The goal is to separate confirmed requirements from open questions so every response can be read on the same basis.

01

Define the product the supplier is pricing

Attach the reference or current drawing and identify the garment family, coverage, control panels, closure, lining and edge finish. State whether the route is OEM from your specification or adaptation of an available reference.

Record: Product version, intended use, target market, construction and open decisions.

02

Provide the quantity matrix

List each style, colour and size allocation. The published standard custom minimum is 300 pieces per style and colour, with exceptions for complex materials or construction. The matrix is a planning input, not automatic acceptance of every proposed split.

Record: Quantity by style, colour and size, plus the planned launch and repeat order structure.

03

Separate development from production

Ask for sample scope and charges, material assumptions, size-set work and the basis for bulk pricing. Identify which documents or decisions are needed before a firm price can be issued.

Record: Sample rounds, reference size, included work, approval milestones and pricing dependencies.

04

List the required commercial inclusions

Request currency, trade term, price basis, packaging, testing, inspection, freight responsibility, quote validity and exclusions. Ask every supplier to flag deviations from the brief.

Record: Unit basis, tooling or sample charges, labels, packing, tests, inspection, freight and exclusions.

05

Compare responses and close the gaps

Use one comparison sheet for all suppliers. Record garment differences, missing inclusions, evidence supplied and unresolved questions before selecting the apparent lowest number.

Record: Specification differences, missing costs, evidence status, commercial exceptions and next actions.

02 / Decision table

The minimum comparison structure.

Copy this structure into your own sourcing file. Add fields when the garment or market requires them, but do not remove a field that changes the cost basis.

ItemRequirement or confirmation
Product and versionBuyer completes the reference, drawing or tech-pack version, intended use and target market.
Quantity matrixBuyer completes quantity by style, colour and size; supplier confirms minimum and cutting constraints.
Material and constructionBoth parties record approved references, alternatives allowed and unresolved decisions.
Quote breakdownSupplier confirms unit basis, development, labels, packing, tests, inspection and exclusions.
Delivery and responsibilityBoth parties agree milestones, trade term, approvals and dependencies before the calendar is fixed.

03 / Working files

Download the blank toolkit.

These files are neutral worksheets, not completed quotations, approvals or supplier evidence. Save your own version and record the responsible owner for each decision.

04 / Buyer questions

What to clarify before the first sample.

Short answers for the points that most often make quotations incomparable.

Must every field be complete before the first contact?

No. Mark unknown items clearly so the supplier can separate confirmed inputs from assumptions and explain what is needed before a reliable quotation.

Should we send the same RFQ to every supplier?

Use the same confirmed scope and record any supplier-proposed alternative separately so quotations remain comparable.

Can we ask for a target-cost alternative?

Yes. Ask which material or construction changes are proposed and how they affect fit, appearance, testing and order minimums.

Can a delivery date be confirmed before material selection?

A supplier may discuss a planning window, but the actual calendar depends on materials, sample approval, deposit and the production plan.

What evidence should accompany the quotation?

Request the relevant sample route, material assumptions, process responsibility and document scope rather than a generic list of badges.

What should be confirmed before paying for samples?

Confirm the garment and reference size, material status, fee, included work, shipping responsibility and the criteria used to review the result.

Send the same brief to our project team.

Attach your quantity matrix, reference image or tech pack and flag the decisions that are still open.

Review My RFQ