Technical package

Build a Tech Pack the Factory Can Use

A tech pack is not a mood board. It is the controlled input that tells the pattern, sample and production teams what the garment is, how it is measured and which material and construction decisions are fixed.

Zipper-front shapewear bodysuit construction reference
01POMMeasurement map
02BOMMaterials and trims
03DrawingConstruction callouts
04VersionChange record

01 / Decision file

Give every page one decision job.

The pack should be readable by a pattern maker, sample room, buyer and quality team without a separate explanation call.

01

Technical sketch

Show front, back, side, openings, seams, topstitch, bonding and hardware.

02

Measurement chart

List POM, reference size, target measurement, tolerance and grading rule.

03

Bill of materials

Name fabric, lining, mesh, elastic, boning, thread, closure, label and packing references.

02 / Fit and grading

Define the body range and anchor size.

A single set of measurements is not a size strategy. The pack should show the fit model, reference size and intended grade.

01

Anchor size

Identify the size that carries the approved fit and measurements.

02

Grade increments

State how each POM changes across the curve and where the grade changes.

03

Tolerances

Agree measurement tolerance by POM and understand how stretch and recovery affect the check.

03 / Control

Make the current version obvious.

A tech pack that changes in chat or email without a version number becomes an unreliable production document.

01

Revision block

Record version, date, author, change summary and approval.

02

Approved references

Link swatches, trims, artwork and sample comments to the correct version.

03

Production freeze

Confirm the final version before PP sample and bulk release.

Questions / short answers

What buyers ask before a sample.

What if we only have a reference photo?

The photo can start development, but a measurable brief still needs garment type, size range, construction priorities and fit intent.

Should stretch percentage be on the tech pack?

Material stretch and recovery should be specified and checked on the finished garment, not treated as a single isolated number.

Who approves a tech pack change?

The buyer and the responsible technical owner should approve changes in writing before sampling or production continues.

Project review

Have a tech pack to review?

Send the current version, reference sample and target order scope. The first review will identify missing construction and measurement inputs.

Review My Project